Create Solid Model-Based P-Data Sections with Projected Logs

RockWorks | Borehole Operations | P-Data | Projected Section

Use this program to:

See also
     P-Data Profiles for single-panel cross sections with projected logs

Feature Level: RockWorks Standard and higher

Menu Options
Step-by-Step Summary
Tips


  1. Access the RockWorks Borehole Manager program tab.
  2. Enter/import your data into the Borehole Manager, if you have not done so already. This tool specifically reads location, orientation (if any), and P-data.
  3. Select the Borehole Operations | P-Data | Projected Section menu option.
  4. Enter the requested program settings, described above.
  5. If you are including logs with the diagram, be sure to click on the 2D Log Design tab at the top of the window to establish how you want the logs to look.
  6. Click on the ProSect Location tab at the top of the window to establish the section location and the "swath" distance to either side, within which borehole logs will be included in the diagram.
  7. Click the Continue button to proceed.

    If you've selected Use Existing Model, RockWorks will load the information from the existing P-Data model (.RwMod file), and will proceed to diagram generation.

    If you've selected Create New Model, the program will scan the project database and extract the XYZ points for all of the downhole measurements for the selected P-Data track. It will apply any source data filters you have requested.

    The program will use the selected algorithm to create a solid model of the point-sampled downhole data representing geophysical, geotechnical measurements, etc. The completed model will be stored on disk under the indicated file name.

    The program will then look at the coordinates specified for the section panels and will construct a vertical profile of each to illustrate the data values, using the selected color scheme. The panels will then be appended together to create the multi-panel section. If requested, logs will be projected onto the section panels; other requested layers will be appended. The completed diagram will be displayed in a RockPlot2D tab in the Options window, if requested.

  8. You can adjust any of the program settings in the main Options tab to the left, and then click the Continue button again to regenerate the section.

    ! If the P-Data model looks OK and you just need to adjust one of the diagram settings, you don't need to keep re-interpolating the model. Choose Use Existing Model and browse for the .RwMod file to be used for the section.

  9. View / save / manipulate / print / export the diagram in the RockPlot2D window.

Back to P-Data Menu Summary

RockWare home page