- When you have defined the import blocks, the coordinates, and the location fields, click on the Finish button at the bottom of the screen.
- If you have requested any warning for duplicate file names, the program will issue such warning(s) during import; respond as you see fit for each warning.
- The imported data will be recorded in the project's database.
- Check locations: If you imported location data, review it at this time: click on a borehole names and then on the Location tab. Are all of the required fields complete? Repeat for additional boreholes.
- Be sure the data types are correctly established: If you have imported lithology, stratigraphy, well construction, interval, time interval or point data, you should be sure the data was posted correctly:
- Expand the Project Tables heading in the Project Manager pane along the left edge of the program window, and expand the Types Tables heading. Double-click the Lithology Types, Stratigraphy Types, and/or Well Construction Types Tables as appropriate for the data that was imported. Are the names correct? Patterns and colors? Are stratigraphic units listed in order from the ground downward ("Order" column)?
! If the types were undefined prior to import and the program determined them on the fly, you will need to complete these tables before working with the data.
- Establish your output dimensions based on the data, by typing in the coordinates, or selecting Scan All Boreholes.
RockWare home page