Computing Optimum Wellbore Paths - XYZ Point Output

Borehole Manager | Striplogs | Compute Horizontal Borehole Path | XYZ Points

This program is used to compute the optimum path for a wellbore, given a starting XYZ point, an ending XY location, upper and lower payzone grid models, and borehole curvature, smoothing, and depth increment settings.

Once the optimum path is computed, the program will create a list with the drilled depths, xyz coordinates, azimuth (bearing), inclination (dip), true depth, payzone thickness, and kickoff depth for the points along the proposed well. The spacing between these points is defined by the "Depth Increments".

! Assumptions:

A video that demonstrates these new capabilities can be viewed at: http://youtu.be/gLRuNCKhkUc

See also:


Menu Options
Step-by-Step Summary


Menu Options

Radius of curvature

Step-by-Step Summary

  1. Access the Borehole Manager program tab.
  2. Select the StripLogs | Compute Horizontal Borehole Path | XYZ Points menu command. 
  3. Enter the requested menu options, described above.
  4. Click the Process button at the bottom of the window to continue.

The program will compute the optimum borehole path between the starting and ending point within the specified payzone surfaces, given the borehole parameters and depth increment you specified. The report will be displayed in a tab to the right, where you can use the menus to save, export, copy the information, etc. Listed there will be:

The depth increments at which these data are listed are defined by the Depth Increment setting defined above.

XYZ Points output

 


Back to StripLogs Menu Summary